FILE - A smokestack stands at a coal plant on June 22, 2022, in Delta, Utah. NASA on Tuesday, Nov. 29, announced that its GeoCarb mission, which was supposed to be a low-cost satellite to monitor carbon dioxide, methane and how plant life changes over North and South America, was being killed because of cost overruns. (AP Photo/Rick Bowmer, File)

FILE - A smokestack stands at a coal plant on June 22, 2022, in Delta, Utah. NASA on Tuesday, Nov. 29, announced that its GeoCarb mission, which was supposed to be a low-cost satellite to monitor carbon dioxide, methane and how plant life changes over North and South America, was being killed because of cost overruns. (AP Photo/Rick Bowmer, File) Banque D'Images
Aperçu

Détails de l'image

Contributeur:

Associated Press

ID de l’image:

2M9MWF6

Taille du fichier:

68,7 MB (604,4 KB Téléchargement compressé)

Autorisations:

Modèle - non | Propriété - nonUne autorisation est-elle nécessaire?

Dimensions:

6000 x 4000 px | 50,8 x 33,9 cm | 20 x 13,3 inches | 300dpi

Date de la prise de vue:

22 juin 2022

Photographe:

Rick Bowmer

Informations supplémentaires:

Cette image peut avoir des imperfections car il s’agit d’une image historique ou de reportage.

Interdit pour toute utilisation à la télévision, en streaming/VOD, au cinéma et dans la presse. Veuillez contacter directement Associated Press pour obtenir une licence d'utilisation de cette image dans le cadre de productions médiatiques.
london_photolibrary@ap.org
Uniquement disponible pour une utilisation éditoriale.